PROJECT 8 - USE OF CONTINUOUS SIMULATION FOR DESIGN FLOW DETERMINATION

The focal point of this project is the development of appropriate advice for the use of continuous simulation techniques as a technique for the development of point flow estimates with a given frequency or the development of a system performance estimate. While there have been a number of pilot studies that have developed alternative approaches (see, for example, Boughton et al., 1999; Droop and Boughton, 2003; Jung and Bae, 2005; and Newton and Walton 2000), a consistent and coherent approach has not resulted.

Project Start: Stage 2 2009

Project Finish: Mid 2013

Contractor: UTS

Find out more -Download the Project 8 Flyer

Revision Project List

Revision Project Timeline